PRE FILLING AND MAIN FILLING STRUCTURE

Pre Filling Unit :
Pre filling unit is an on-line equipment used to fill 19/14.2 kg cylinder by time based cut off. The system shall be located before fine filling unit. A pre determined quantity of LPG is filled in the cylinder and it will helps to reduce the time required for fine filling operation on weighing scale. The quantity of LPG filled depends on the duration of operation, which can be adjusted by pneumatic timer device provided.


Fine Filling Unit :
Fine filling unit is an on-line equipment used for fine filling the 19/14.2 kg cylinder by weight based cut off. The system shall be located after pre filling unit on weighing scale.



INDIAN OIL CORPORATION LIMITED
Cochin Pondicherry
Pune Trichy
Mannargudi  

BHARATH PETROLEUM CORPORATION LIMITED
Pithambur
Dharwad
Nagpur Pune
Vijayawada  

ASSAM OIL DIVISION
Guwahati
Mayiladuthurai
 
 
Copyright © Raghavendra Automation Pvt, Ltd. 2007
Phone: +91-44-24897214
FAX: +91-44-24893450